Our Projects

Case Study

Project Managing over 70 Bridge, Highway Structures and Traffic Projects in Oxford (£7m)

Kennington Bridge Railway Safeguarding- Additional Props added to the East and West Piers

127 Consultancies Limited are currently Project Managing over 70 Structures and Civil Engineering Schemes in Oxfordshire working in collaboration with the County Council and their Contractor, valued at over £7million worth of fees.  

 

Our main achievement has been to reduce the budget deficit from over £500,000 over a two-year period. This has been achieved by preparing detailed spreadsheets enabling all the individual tasks to be tracked over the lifetime of the project which is managed in ASTA.

The largest project is the Kennington Bridge Safeguarding which involves introducing additional props to the east and west piers which are located near a railway and stream. Railway possessions were obtained to undertake the work which was completed under the structure. We have been project managing this scheme for 2 years and we are currently on phase 5 of the works which involves high level strengthening and monitoring of the bridge. The bridge deck will eventually be replaced.

Case Study

Calvert Pipeline Diversion and Pressure Reduction Station Rebuild (Rayden Engineering - HS2) -Traffic Management Plan

The project comprised of a pipeline diversion of an existing high-pressure gas pipeline to accommodate the construction of the High-Speed Rail Link (HS2) near Calvert, Buckinghamshire. The project also included the construction of a new Pressure Reduction Station (PRS) and the removal of the above ground equipment from the existing Steeple Claydon PRS. The pipeline was 600mm in diameter and approximately 4.5km long.

127 Consultancies Limited prepared the Traffic Management Plans and reports for deliveries and construction traffic to the site in Buckinghamshire off the M40.

Traffic Management Plans for the Calvert Pipeline Diversion for HS2

Case Study

Road Safety Audits – Transport for London

Stage 4 Road Safety Audit undertaken on Lewisham Gyratory

127 Consultancies Limited were commissioned to undertake Road Safety Audits for Transport for London. This involved undertaking site visits and writing reports.

The Road Safety Audits were carried out in accordance with the TfL Procedure SQA-0170 dated May 2014.

Case Study

Airdri, Oakfield Estate Water Supply and Drainage Design

127 Consultancies Limited were commissioned to carry out the design of a new water supply and drainage design. New drainage and water supply services were required from the existing development into the new building.

127 Consultancies Limited project managed the water supply and drainage design which were carried out by our joint venture partners.

Water Supply, Pumping Station and Drainage Supply for Airdri, Oakfield Estate

Case Study

Charles Babbage Road, Cambridge (Eastern and Western Stops Options) – Road Safety Review (University of Cambridge)

127 Consultancies Limited were commissioned to undertake a Road Safety Review of the Proposed West Campus C2C Interface Project on Charles Babbage Road at the University of Cambridge. The Road Safety Review involved an assessment of the West Campus C2C Scheme which consisted of two options:

  1. Eastern Stops Option – This proposal consists of introducing additional bus stops along Charles Babbage Road to the east of its junction with High Cross Road (east); and
  2. Western Stops Option – Involves a single set of bus stops on Charles Babbage Road near the High Cross Road (east) junction.

The West Campus C2C Interface Scheme also involved the following additional measures:

  • Introduction of traffic signal control with Intelligent Transit Priority and a pedestrian stage at the High Cross Road (west) junction.
  • Traffic signal control with Intelligent Transit Priority and a pedestrian stage at the High Cross Road (east) junction.
  • Three additional zebra crossings along Charles Babbage Road.
  • Improvements to the existing segregated cycleway and footway along either side of Charles Babbage Road.
  • Construction of a new 20-mph transit-only link road from Charles Babbage Road into Coton Path, with a foot and cycle bridge connecting to Coton Path.
  • LTN 1/20 signal-controlled crossing with divided cycle and footway to maximise inter-visibility to cyclists on the new link road junction with Coton Path.
  • Existing car park access rearranged on the southern side of Charles Babbage Road to accommodate the new link road into Coton Path.
  • New scooter and cycle parking area on the northern side of Charles Babbage Road.

The Road Safety Review was commissioned by Ramboll UK Ltd.

Road Safety Review – Charles Babbage Road (University of Cambridge)

Case Study

Expert Witness Advice – Drainage Report into Flooding at Property

We were commissioned to act as an Expert Witnesses for a resident who had experienced flooding at his property eight times over a six-year period. The local authority had undertaken a CCTV survey at the property and concluded that no structural damage had occurred to the surface water pipes. It was however not clear from the CCTV report how the surface water sewer was connected. 

A site visit was undertaken at the property and the surface and foul water drainage traced, along with a detailed drainage report prepared for the Client.

The conclusion of the report was that the Client should be entitled to compensation because the highway gully was blocked up with leaves outside his property. Since the local authority had cleared the gully from blocked leaves no flooding had occurred at the property.

Expert Witness Advice – Drainage Report